 |
 |
 |
| The generator used to power the Melbourne tram. |
1919 pulls "S" truck, with passengers !. |
Comming to the end of the line , int he trees. |
 |
 |
 |
| "S"Trucks. |
1919 as far as it can go (as of December 2006). |
The last concrete sleeper laid so far, just before the bridge. |
 |
 |
 |
| The bridge holding up progress. |
Concrete sleeper clip. |
A Trike comes over the bridge after doing a inspection run. |
 |
 |
 |
| The trip on the trike was exceptional.The bush closed in alot - is there track there, I am assured by our driver there is , as we come on it. |
The views were great as we climbed and climbed, cannot wait to hear 1919 up these grades! |
The end of the trike ride at the burnt out culvet, that is dissapearing into the bush. |
 |
 |
 |
| The trike back at base. |
A Melbourne tram in NSW...... |
1919 shunts at the end of the day. |
 |
 |
 |
| 1919. |
1919 does some shunting. |
1919 lifts their stainless steel pass cars back to the station. |
 |
| Movie: .wmf format. : 1919 lifts their stainless steel pass cars back to the station. |